Monday - Saturday, 10.00 am to 07.00 pm,    Call Us: +91 9959580645
Teaching Languages: English, Telugu, Urdu, Hindi & Arabic

CIVIL – SITE ENGINEERING / PROJECT ENGG. (PRACTICAL)

Module- I : GENERAL INTRODUCTION & BACK-GROUND

  • UOM ( UNITS OF MEASUREMENTS ) & DIMENSIONS – LINEAR , AREAL &VOLUMES - RULES.
  • WHAT IS A QUANITY ESTIMATE – LEVELS & LINES - PRACTICAL APPLICATIONS.
  • DATA REQUIRED TO PREPARE AN ESTIMATE.
  • DIFFERENCE BETWEEN DETAILED ESTIMATE & ABSTRACT COST ESTIMATE – SOLVED EXAMPLES.
  • BUDGET CALCULATIONS
  • TIME CALCULATIONS.
  • WHAT IS A CONTRACT ?
  • 4. DIFFERENT KINDS OF CIVIL ENGINEERING PROJECTS / STRUCTURES –

  • BUILDING PROJECTS – INDIVIDUAL HOUSES , APARTMENTS , COMMERCIAL MALLS , TOWNSHIPS ETC.,
  • ROAD PROJECTS – ASPHALT & CONCRETE PAVEMENTS.
  • OIL & GAS PROJECTS
  • INDUCTRIAL PROJECTS
  • IRRIGATION DAMS
  • BRIDGES
  • CULVERTS
  • 5. HOW TO READ THE – “ENGINEERING DRAWINGS& DETAILS “ ?

  • PLANS
  • ELEVATIONS
  • SECTIONS

  • 6. HOW TO READ THE PTS – PROJECT TECHNICAL SPECIFICATIONS / CONTRACT SPECIFICATIONS.

    METHODS OF TAKING OUT QUANTITIES

  • LONG – WALL & SHORT – WALL METHOD
  • CENTRE-LINE METHOD
  • PLINTH AREA METHOD
  • CUBICAL CONTENTS METHODS
  • SERVICE UNIT METHOD.
  • 8. QUANTITY CALCULATIONS / TAKE-OFF’S - STRUCTURAL & ARCHITECTURAL ITEMS.

  • EARTHWORKS - SURVEYING - EXCAVATION/ CUTTING, FILLING & BACK-FILLING WORKS – ROADS & BUILDINGS
  • ANTI-TERMITE , POLYTHENE SHEET ,WATER-PROOFING MEMBRANE & SCREED CONCRETE.
  • CONCRETE WORKS –FOUNDATIONS (ISOLATED ,STEPPED ,RAFTS ,PILES AND PILE-CAPS ,ROCK-ANCHOR ETC., ), RETAINING WALLS, DPC, COLUMNS , BEAMS , SLABS ,LINTELS, WATER TANKs , SEPTIK TANK , ETC.,
  • SHUTTERING & FORM WORKS
  • STEEL - PREPARATION OF “BBS – BAR BENDING SCHEDULES “ & QUANTITY TAKE-OFF’S
  • PLINTH BEAMS, COLUMNS, SLAB BEAMS, SLABS, ETC.
  • BRICK WORK CALCULATION– ROOMS , COMPOUND WALLS ETC.,
  • FINISHING WORKS – TILES – FLOORING & CLADDING, PLASTER (IN AND OUT),STRUCTURAL GLAZING & ALUMINIUM FRAMES, PAINTING, WOOD WORKS CALCULATION ETC.
  • INTERIOR DECORATING WORKS
  • 9. BASIC MEP – (MECHANICAL, ELECTRICAL AND PLUMBING) :

  • WATER SUPPLY
  • STORM WATER
  • DRAINAGE
  • FIRE-FIGHTING
  • ELECTRICAL
  • AIR-CONDITIONING
  • 10. HOW TO PREPARE A B.O.Q (BILL OF QUANITITIES) & B.O.M (BILL OF MAYTERIALS) – COMPUTER AIDED.
    11. WHAT IS RATE ANALYSIS & SCHEDULE OF RATES | HOW TO CALCULATE RATE - ANALYSIS FOR ALL CONSTRUCTION ACTIVITIES ?
    12. DETAILED ESTIMATION, PREPARATION OF B.O.Q (WORKS)&B.O.M – COMPUTER AIDED.

    13. TYPES OF CONTRACTS –

  • LUMPSUM CONTRACT
  • ITEM RATE CONTRACT
  • COST-PLUS CONTRACT
  • EPC CONTRACT
  • 14. WHAT IS TENDERING AND HOW TENDERING PROCESS HAPPENS -

  • PRE-BID PREPARATIONS
  • WHAT ARE TENDER DOCUMENTS / CONTRACT DOCUMENTS.
  • CALLING FOR TENDERS
  • FINALIZING L1, L2 & L3 - NEGOTIATION TECHNIQUES
  • AWARDING OF CONTRACT – KICK-OFF MEETING
  • 15. ROLES & REPONSIBILITIES OF ESTIMATOR &QUANTITY SURVEYOR.
    16. MATERIAL PROCUREMENT – PURCHASE ORDERS & WORK ORDERS – RECEIPT AT STORES .
    17. WEEKLY / MONTHLY BILL PREPARATION & RETENTIONPERCENTAGE
    18. SUB-CONTRACTING – QUOTATIONS & INVOICE CLEARING
    19. WORK ORDER PREPARATION STEPS.

    20. WHAT IS CASH FLOW?

  • WEEKLY CASH FLOW
  • MONTHLY CASH FLOW
  • 21. M-BOOK & RECORDING MEASUREMENTS.
    22. CO-ORDINATION WITH QA/QC FOR SIGNED INSPECTION REQUESTS.
    23. BILL PREPARATION, HOW TO CHECK THE BILLS, BILL CERTIFICATIONS & HOW TO CLOSE A BILL
    24. ROLE OF QUANTITY SURVEYOR IN POST CONSTRUCTION WORKS.
    25. MAKE VARIATION ORDERS – RECORDING OF WORKS.
    26. DOCUMENTATION BACK-UPS ( SOFT COPIES & HARD COPIES )
    27. VALUATION OF PROPERTIES.
    28. FIXING OF RENTS
    MODULE: II – ADVANCED –QS
    A. PRE – CONTRACT / TENDERING ( BEFORE CONTRACT IS AWARDED )
    B. POST– CONTRACT / TENDERING ( AFTER CONTRACT IS AWARDED )